Success Story
From Surge Struggles to Steady Performance
How one U.S. refinery transformed a failing compressor into a reliable, high-performing asset with CCC Inside® for Yokogawa CENTUM VP
Persistent surges, manual workarounds, unreliable startup. These were just a few of the challenges a U.S. refinery faced with a critical refrigeration compressor in its Alkylation Unit. Downtime, energy waste, and operator fatigue were mounting until they partnered with CCC.
This story details how CCC delivered a smart retrofit solution that integrated directly into the plant’s Yokogawa platform. From improved antisurge protection and automated control to real-time performance diagnostics, the results were immediate and impressive.
Discover how this facility now saves over $140,000 annually in energy costs, while operating with fewer disruptions, more visibility, and greater long-term confidence.
Discover how to eliminate surging, unlock energy savings, and restore optimal compressor performance with CCC Inside® for Yokogawa