/content/process/us/en/search.html

Fuel Delivery Accessories

Tightness controls TC

Tightness controls for checking two safety valves before or after burner run, with adjustable test period (5-30 s) for adjustment to different test volumes, leakage rates and inlet pressures, EU certified.

Overview
Tightness controls for checking two safety valves before or after burner run, with adjustable test period (5-30 s) for adjustment to different test volumes, leakage rates and inlet pressures.

Features & Benefits:
  • TC 1V for attachment to valVario
  • TC 2 for quick opening individual valves
  • TC 3 for quick or slow opening individual valves
Replacement Products for the TC 4: More Information:
Name
Description
File Size
Date
Size
No support documents tagged to this product
An error occurred . Please try after sometime
Category@category|Type@type

Filters

Product Number
Part Number
Description
Add to list
KS84765510
VLV,PROVING CTL,TC 116W05T
KS84765531
VLV PROVING CTL TC 116V05N
KS84765541
LEAKTEST UNIT,TC 1V05W/W,MAINS V 230 VAC
KS84765543
LEAKTEST UNIT,TC 1V05Q/Q,MAINS V 120 VAC
KS84765545
LEAKTEST UNIT,TC 1V05K/K,MAINS V 24 VDC,
KS84765552
LEAKTEST UNIT,TC 1C05W/W,MAINS V 230 VAC
KS84765554
LEAKTEST UNIT,TC 1C05Q/Q,MAINS V 120 VAC
KS84765556
LEAKTEST UNIT,TC 1C05K/K,MAINS V 24 VDC,
KS84765610
VLV PROVING CTL TC 218R05T
KS84765631
LEAKTEST UNIT,TC 2R05W/W,MAINS V 230 VAC