/content/process/us/en/search.html

White Paper

Reduce Spinning Reserve
and Gas Turbine Maintenance

Industrial facilities that use gas turbines to produce power on site are continuously running redundant turbines on spinning reserve to ensure uninterrupted operations, but the costs are considerable in terms of fuel, equipment wear and maintenance, and carbon footprint.

With more companies moving toward sustainable operations and net zero goals, there is a need for a solution that reduces fuel consumption and carbon emissions but does not negatively impact output or reliability. Integrating a Battery Energy Storage System (BESS) can reduce operating costs as well as carbon footprint without sacrificing performance.

Optimize energy resilience and meet sustainability goals with technology, energy management systems, analytics and services in one place.

Complete the form to download the white paper.